Skip to main content
RACKWELL · Warehouse racking & shelving manufacturer · Fuzhou, China · ISO 9001 · EN 15512 engineered WhatsApp [email protected]
Home > Products > Mezzanine Floors › Mezzanine Floor Racking System

Mezzanine Floors · Factory direct

Mezzanine Floor Racking System

Rack-supported and column-supported mezzanine floors with steel floor panels, stairs, handrails and pallet gates that multiply usable storage area.

ModelRW-MZ
Upright height (mm)2 or 3 tiers, 2200–3000 per tier
Width x depth (mm)Project size
Levels2–3
Load per level300–1000 kg/m²
MaterialQ235 columns and beams, steel floor panels
Surface finishPickling, phosphating, electrostatic powder coating, high-temp curing
ColourBlue / orange / grey / black, RAL customizable
AssemblyBolted, on-site assembly
PortFuzhou / Xiamen
  • EN 15512 load tables
  • Any RAL colour
  • 15–25 days
  • Fuzhou / Xiamen port

Rack-supported and column-supported mezzanine floors with steel floor panels, stairs, handrails and pallet gates that multiply usable storage area.

Engineering drawings and load calculations supplied with every project.

Key features

  • Doubles or triples floor space
  • Steel panel, grating or MDF decks
  • Stairs, handrails, pallet gates
  • Shelving or racking on each tier

Applications

E-commerce, garment, electronics and spare-parts warehouses.

Packing & shipping

Knocked-down, parts bundled with PE foam + carton, pallet optional. Shipped knocked-down from Fuzhou or Xiamen port; our team provides a container loading plan with CBM per bay and 20GP / 40HQ quantities with every quotation.

Technical data

ParameterValue
ModelRW-MZ
Upright height (mm)2 or 3 tiers, 2200–3000 per tier
Width x depth (mm)Project size
Levels2–3
Load per level300–1000 kg/m²
MaterialQ235 columns and beams, steel floor panels
Surface finishPickling, phosphating, electrostatic powder coating, high-temp curing
ColourBlue / orange / grey / black, RAL customizable
AssemblyBolted, on-site assembly
PortFuzhou / Xiamen
StandardsFEM 10.2.02 / EN 15512 design; load notices supplied
MOQ1 × 20 ft container (mixed systems accepted)
Lead time15–25 days after deposit

Values are typical ranges; exact capacities depend on beam section, frame thickness and level spacing. Request the load table for your configuration.

Applications

Packing & shipping

1

Knock-down

Frames pre-assembled or flat; beams bundled 10–20 pcs; hardware boxed.

2

Protection

Stretch film, corner boards, steel strapping; labels by bay number.

3

Loading plan

20 ft / 40 ft HQ plan issued with packing list and photos.

4

Documents

Assembly drawings, load notices, mill certs, CO / BL / packing list.

FAQ

Can you supply a layout for Mezzanine Floor Racking System?
Yes. Send floor plan, clear height, pallet / carton size and forklift type; we return a CAD layout with quantities within 24–48 hours.
What colours and finishes are available?
Powder coating in any RAL colour (standard RAL 5015 blue frames / RAL 2004 orange beams, grey) or hot-dip galvanised for outdoor and cold-store use.
Do you supply installation?
We supply assembly drawings and video; installation can be arranged through partner installers in many regions, or our supervisors can travel for large projects.

Related products

Other systems in Mezzanine Floors

Mezzanine Floor Racking System

Mezzanine Floor Racking System

Rack-supported and column-supported mezzanine floors with steel floor panels, stairs, handrails and pallet gates that multiply usable storage area.

Quote WhatsApp Email